From Inception to Completion - A Blind Bored Ventilation Shaftand Watertight Lining for the Springvale Coal Mine

机译:从开始到完成-斯普林维尔煤矿的盲孔通风井和水密衬里

获取原文
获取原文并翻译 | 示例

摘要

In 2001,the Springvale Coal Mine determined a requirement for a 360 mrndeep vertical airway to ventilate ongoing underground longwall miningrnoperations.The project,referred to as the Springvale No 3 VentilationrnShaft,was completed in 2003 -2004 by blind boring a 4.25 m diameterrnhole from the surface to the coal seam at 360 m depth.The shaft wasrncompleted with a 3.5 m inside diameter lining made from a continuousrnwatertight steel and concrete composite pipe.Presented from both thernclient 's and the contractor 's perspective,the following paper describes thernprocess of constructing a blind bored ventilation shaft for this application.rnBeginning with the client 's definition of the requirements andrnspecifications for the shaft,the paper describes the steps followed byrnSpringvale Coal prior to awarding the contract.Springvale 's processrninvolved a thorough site investigation including procurement ofrngeotechnical data for prospective contractors and the management ofrnissues relating to safety,quality and the environment.The client 's view srnfollowed by a description of the planning and works performed by theirrnnominated shaft drilling contractor,Ardent Underground Pty Ltd.Therncontractor 's description of the works includes the details of the blindrnshaft drilling and lining construction process used for this application.rnThe design of the shaft lining installed at Springvale Coal was the first ofrnits type to be used in Australia.The successful installation of a watertightrncomposite shaft lining and the safety of the method,which did not requirernany personnel to enter the shaft or the mine,were among the positivernoutcomes from the project.
机译:2001年,斯普林维尔煤矿确定了一条360米深的垂直气道,以对正在进行的地下长壁开采作业进行通风。该项目被称为``斯普林维尔3号通风井'',该项目于2003年-2004年完成,方法是从矿井中钻一个直径为4.25 m的盲孔在360 m深度的煤层表面。竖井用连续的水密钢和混凝土复合管制成的内径为3.5 m的衬里。从客户和承包商的角度提出,以下论文描述了施工过程。从客户对竖井的要求和规格的定义开始,本文描述了在授予合同之前,Springvale Coal所遵循的步骤。Springvale的过程涉及了彻底的现场调查,包括获取岩土技术数据准承包商和遗体管理客户的观点之后是对他们指定的竖井钻井承包商Ardent Underground Pty Ltd的计划和工作的描述。承包商的工作描述包括盲井钻探和安装的细节。此应用程序使用的衬砌施工过程。rn在Springvale Coal安装的竖井衬砌设计是在澳大利亚使用的首款产品。水密复合竖井衬砌的成功安装和方法的安全性,不需要任何人员进入竖井或矿井,属于项目的积极成果之一。

著录项

  • 来源
  • 会议地点 Perth(AU)
  • 作者

    R OBrien; J Zeni;

  • 作者单位

    Springvale Coal Pty Ltd,PO Box 198,rnWallerawang NSW 2845;

    rnArdent Underground Pty Ltd,PO Box 135,rnStrathfield South NSW 2136.E-mail:jzeni@ardentunderground.com;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号