首页> 外文会议>WEFTEC 2012;Water Environment Federation annual technical exhibition and conference >DEVELOPMENT OF AN ENVIRONMENTAL SAMPLING AND MONITORING PROGRAM AS A MITIGATION TOOL TO ADDRESS INDIRECT AND CUMULATIVE IMPACTS
【24h】

DEVELOPMENT OF AN ENVIRONMENTAL SAMPLING AND MONITORING PROGRAM AS A MITIGATION TOOL TO ADDRESS INDIRECT AND CUMULATIVE IMPACTS

机译:开发环境采样和监视程序作为缓解间接和累积影响的缓解工具

获取原文
获取原文并翻译 | 示例

摘要

In 2006, the City of Raleigh had four major water infrastructure projects in the environmentalrnpermitting phase: a major regional wastewater pump station, a major expansion of the City’srnonly wastewater treatment plant, a greenfield water treatment plant, and a major sewerrninterceptor. North Carolina regulations, specifically the State Environmental Policy Act (SEPA),rnrequires that direct, indirect, and cumulative impacts be evaluated in the environmentalrnpermitting process. Several agencies within the North Carolina Department of Environment andrnNatural Resources (DENR) rejected these four projects for approval over mitigation for indirectrnand cumulative impacts (ICI). A comprehensive Sampling and Monitoring Program wasrnestablished to meet the regulatory requirements for ICI mitigation and is currently in the fifthrnyear of a five year Division of Water Quality (DWQ) basinwide planning cycle. This paperrnprovides a detailed assessment of the indirect and cumulative impacts of urbanization, if any, onrnthe City’s service area watersheds and neighboring downstream watersheds as delineated in thernSampling and Monitoring Program.
机译:2006年,罗利市在环境许可阶段有四个主要的水基础设施项目:一个主要的区域废水泵站,该市唯一的污水处理厂的一个大型扩建,一个绿地水处理厂和一个主要的下水道拦截器。北卡罗莱纳州的法规,特别是《州环境政策法》(SEPA),要求在环境许可过程中评估直接,间接和累积的影响。北卡罗莱纳州环境和自然资源部(DENR)内的几个机构拒绝了这四个项目,以批准间接和累积影响(ICI)的缓解措施。为了满足ICI缓解的法规要求,已经建立了一个全面的采样和监视程序,目前该程序处于整个流域水质部(DWQ)五年计划周期的第五年。本文对“抽样和监测计划”中所描述的城市化对纽约市服务区流域和邻近下游流域的间接影响和累积影响进行了详细评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号