首页> 外文会议>WEFTEC 2011;Annual Water Environment Federation technical exhibition and conference >Maintaining High Quality Service with Targeted Investments: Development of an Asset Management Plan for a Large Utility
【24h】

Maintaining High Quality Service with Targeted Investments: Development of an Asset Management Plan for a Large Utility

机译:通过有针对性的投资保持高质量的服务:大型公用事业公司资产管理计划的制定

获取原文
获取原文并翻译 | 示例

摘要

The Piscataway Wastewater Treatment Plant (WWTP) is located in Accokeek, MD. Initiallyrncommissioned in the 1960s and currently with an average daily design capacity of 114,000 m3/drn(30 mgd), the Piscataway WWTP is one of the oldest and largest facilities owned and operatedrnby the Washington Suburban Sanitary Commission (WSSC). Its size, age, and effluent treatmentrnrequirements make the Piscataway WWTP an ideal candidate for asset management planning.rnAn asset management plan (AMP) has been developed for the Piscataway WWTP and WSSCrnhas recently begun implementation of its recommendations. Development of the AMP requiredrnsignificant involvement from WSSC staff and provides recommendations to improve both thernphysical infrastructure of the facility, and recommendations for the personnel and businessrnprocesses at the Piscataway WWTP to help implement the infrastructure improvements. Thisrnpaper discusses the development process of the AMP and the value it has provided to thernPiscataway WWTP and WSSC organization.
机译:皮斯卡特维废水处理厂(WWTP)位于马里兰州阿科凯克。 Piscataway污水处理厂最初于1960年代投入使用,目前平均日设计能力为114,000 m3 / drn(30 mgd),是华盛顿郊区卫生委员会(WSSC)拥有和运营的最古老,规模最大的设施之一。皮斯卡塔韦污水处理厂的规模,年龄和废水处理要求使其成为资产管理计划的理想选择。皮斯卡塔韦污水处理厂已经制定了资产管理计划(AMP),WSSC最近开始执行其建议。 AMP的开发需要WSSC员工的大量参与,并为改善设施的物理基础结构提供建议,并为Piscataway WWTP的人员和业务流程提供建议以帮助实施基础结构改进。本文讨论了AMP的开发过程及其为Piscataway WWTP和WSSC组织提供的价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号