Repair Strategy to Reduce Operation Service Interruption in a 48' Natural Gas Pipeline

机译:减少48英寸天然气管道运营和服务中断的维修策略

获取原文
获取原文并翻译 | 示例

摘要

This paper describes the damage caused by a tropical storm to a 48" gas pipeline considered to be the main natural gas supplier within Mexico's distribution network. Included is a detailed description of the temporary and permanent repairs and rehabilitation carried out. The pipeline section damaged during this natural event is located in a wide water crossing of the river "Tecolutla" in Veracruz, southern Mexico. The construction process to make a new crossing included horizontal drilling using state of the art technology, extensively applied and improved within the industry during the past 10 years. To accomplish the operation, a novel technique was applied, since the pipeline dimensions (48" diameter and 853 m length), required special tools and equipment Only twice before in the world have projects similar to this one been attempted. This was the first ever application in Mexico. Therein lies the uniqueness and importance of its successful completion, despite the logistical problems and unforeseen difficulties that the contractor was presented with, such that at times it appeared that the work would not be successfully completed. The need to keep the pipeline operating during the project caused delays in most of the scheduled activities. A key factor to ensuring a successful end to this project was the contractor selection. Supervision and quality control were also important issues during the project's development. The horizontal drilling approach allowed different arrangements for the pipeline crossing to be assessed. The arrangement chosen avoids the use of a gate valve and a bypass on the right side of the crossing, with the advantage of keeping this pipeline section 7 metres below the riverbed.
机译:本文描述了热带风暴对48“天然气管道造成的损害,该管道被认为是墨西哥分销网络中的主要天然气供应商。其中包括对临时和永久性维修及修复的详细描述。这个自然事件位于墨西哥南部韦拉克鲁斯州“ Tecolutla”河的宽阔水路口,建设新水路口的过程包括使用最先进的技术进行水平钻井,在过去的行业中得到广泛应用和改进10年,为了完成操作,由于管道尺寸(直径48“,长度853 m)需要特殊的工具和设备,因此采用了一种新颖的技术。在世界上,只有两次尝试过类似的项目。这是墨西哥有史以来的第一个应用程序。尽管承包商遇到了后勤方面的问题和不可预见的困难,但成功完成工作的独特性和重要性就在于此,有时似乎无法成功完成工作。在项目期间保持管道正常运行的需求导致大多数预定活动的延迟。确保成功结束该项目的关键因素是承包商的选择。监督和质量控制也是项目开发过程中的重要问题。水平钻探方法允许评估管道穿越的不同布置。选择的布置避免在交叉口的右侧使用闸阀和旁通管,其优点是使该管道段保持在河床以下7米处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号