【24h】

Schedule Optimisation of Large Complex Mining Operation

机译:大型复杂采矿作业进度优化

获取原文
获取原文并翻译 | 示例

摘要

Mine planners must often develop strategies to deal with multi-element ores, feeds to multiple processes, stockpiles, and specific ore blends. These strategies must maximise the business value, ensuring that realistic environmental, mining, processing, marketing and financial constraints are imposed. As more of these strategies and constraints are incorporated into the optimisation process, the solution time can quickly limit the level of 'optimisation' a study achieves. This paper reviews an efficient mine schedule optimisation technique which expands the range of scheduling strategies that can be simultaneously optimised. The interaction between cut-off grade, production rate, reserve sequencing, stockpiling, ore properties and mill operating parameters are considered in the optimisation. Principles are discussed in this paper which have been successfully extended to scheduling large, complex mining operations. Several examples are then presented to show how multi-policy optimisation can be applied to wide range of situations.
机译:矿山规划者必须经常制定策略来处理多元素矿石,多种工艺的进料,库存以及特定的矿石混合物。这些策略必须最大化业务价值,确保施加现实的环境,采矿,加工,营销和财务约束。随着更多这些策略和约束条件被纳入优化过程,求解时间会很快限制研究达到的“优化”水平。本文回顾了一种有效的矿山调度优化技术,该技术扩展了可以同时进行优化的调度策略的范围。优化过程中考虑了品位等级,生产率,储藏顺序,储备,矿石性质和磨机操作参数之间的相互作用。本文讨论了原理,这些原理已成功扩展到调度大型,复杂的采矿作业。然后提供了几个示例,以说明如何将多策略优化应用于各种情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号