【24h】

DESIGN CONSTRUCTION OF THE WEST DON LANDS STORM WATER CONVEYANCE SYSTEM

机译:西唐土地暴雨水输送系统的设计与施工

获取原文
获取原文并翻译 | 示例

摘要

Waterfront Toronto is undertaking a large scale, urban renewal project of the West Don Lands in Toronto, Ontario. As a part of this development, a large flood protection landform was constructed to protect the site from flooding by the Don River, requiring storm water on the site to be redirected to the west. A new storm water outfall was needed to convey this redirected flow out to Lake Ontario. To meet the City of Toronto's 2006 Wet Weather Flow Management Guidelines, storm water needs to be treated before it can be discharged into the environment. The Storm Water Conveyance System (SWCS) project is the first phase of the overall storm water management for the West Don Lands and includes the entire underground infrastructure to manage storm water flow and to allow for a storm water treatment facility that will be built in the second phase of the project. The major components of the SWCS project are two large-scale underground oil grit separators, a vortex drop shaft, deep rock tunnels, an overland flow inlet, a large diameter storage shaft, an overflow structure, and an outfall connection to Lake Ontario. One of the more unique components of the SWCS project was the overflow structure, a large tower in the center of the main shaft that always contains water at lake level and allows storm water to overflow the storage system in large storms and bypass treatment. This structure was built using precast concrete components that were post-tensioned to secure all the segments together. This approach required significant planning and design to ensure that the pre-cast segments were watertight upon completion. This paper discusses the design and construction of the hydraulic structures and components that make up the entire Storm Water Conveyance System for the West Don Lands redevelopment.
机译:多伦多滨水区正在进行安大略省多伦多市西顿土地的大规模城市更新项目。作为该开发项目的一部分,修建了一个大型的防洪地形,以保护该地点免受Don River的洪水侵袭,要求将该地点的雨水重新引导至西部。需要一个新的雨水排放口,以将这种重定向的水流输送到安大略湖。为了满足多伦多市的《 2006年潮湿天气流量管理指南》,在将雨水排放到环境中之前,需要对其进行处理。雨水输送系统(SWCS)项目是West Don Lands整体雨水管理的第一阶段,包括整个地下基础设施,以管理雨水流量并允许在雨林中建造雨水处理设施。该项目的第二阶段。 SWCS项目的主要组成部分是两个大型地下油砂分离器,一个旋涡降井,深部的岩石隧道,一个陆上进水口,一个大直径的存储井,一个溢流结构以及与安大略湖的排污管。 SWCS项目更独特的组成部分之一是溢流结构,它是主轴中心的一座大塔,该塔总是在湖平面上盛水,并允许暴雨水在大暴雨中溢流存储系统并进行旁路处理。该结构是使用预制混凝土构件建造的,这些构件经过预张紧以将所有节段固定在一起。这种方法需要大量的计划和设计,以确保预制部分在竣工时是水密的。本文讨论了构成West Don Lands重建的整个雨水输送系统的水力结构和组件的设计和施工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号