首页> 外文会议>20th world gas conference >AO-03: THE ELGIN/FRANKLIN NORTH SEA GAS DEVELOPMENT GRASPS HP/HT CHALLENGES
【24h】

AO-03: THE ELGIN/FRANKLIN NORTH SEA GAS DEVELOPMENT GRASPS HP/HT CHALLENGES

机译:AO-03:ELGIN / FRANKLIN北海天然气开发图HP / HT挑战

获取原文
获取原文并翻译 | 示例

摘要

The Elgin and Franklin fields, located in the Central Graben area of the North Sea, contain importantrnquantities of rich natural gas condensates. The reservoirs are deep and sour, with abnormal high pressures,rnextreme temperatures (HP/HT) and significant levels of both CO2 and H2S. This paper describes some ofrnthe challenges, particularly the HP/HT conditions, the means to overcome them and the currentrndevelopment plans. Analytical equipment and methods to provide an acceptably reliable basis forrnunderstanding and predicting future production performance in the absence of applicable analogousrnexperience are identified. Improved drilling methods have been applied during the Elgin appraisal drillingrnprogramme to achieve progressively longer wells with greater offsets. The field architecture for anrnintegrated development based on offshore processing to a gas specification has been defined and FEEDrnstudies have been completed. The current process evolution is described taking account of the conflictingrndemands of gas marketing conditions and the heavy investments for wells and large processing demands tornmaximise economic recovery of the hydrocarbons. The development plan is discussed.
机译:位于北海中部格拉本地区的埃尔金和富兰克林油田含有丰富的天然气凝析油。储层深而酸,具有异常的高压,极高的温度(HP / HT)以及大量的CO2和H2S。本文介绍了一些挑战,特别是HP / HT条件,克服这些挑战的方法以及当前的发展计划。确定了在缺乏适用的类似经验的情况下为理解和预测未来生产性能提供可接受的可靠基础的分析设备和方法。在埃尔金评估钻探计划期间,已采用了改进的钻探方法,以实现渐进更长的井,并具有更大的偏移量。定义了基于海上工艺的天然气综合开发的现场架构,并完成了FEEDrnstudys。描述当前的工艺发展时要考虑到天然气销售条件的矛盾,以及对井的大量投资和大量加工需求,以最大限度地提高碳氢化合物的经济采收率。讨论了开发计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号