...
首页> 外文期刊>Journal of Petroleum Technology >Advanced Drilling in HP/HT: Total's Experience on Elgin/Franklin (UK North Sea)
【24h】

Advanced Drilling in HP/HT: Total's Experience on Elgin/Franklin (UK North Sea)

机译:HP / HT的高级钻探:道达尔在Elgin / Franklin(英国北海)的经验

获取原文
获取原文并翻译 | 示例

摘要

Drilling high-pressure/high-temperature (HP/HT) exploration wells remains a challenge, despite years of experience acquired by the drilling/completion industry. Development wells have further expanded the envelope of performance of the technologies and procedures required to deliver production from HP/HT fields safely and economically. Now comes the time of drilling and completing infill wells, which paradoxically appear to be more difficult as depletion increases and the mud-weight window (MWW) diminishes. To overcome this problem, intense engineering work has been carried out to better understand the effect of the depletion on compaction and fracturing gradient, to design and qualify new drilling-mud systems combined with stress-caging techniques, and to prepare contingent solutions with the deployment of expandable- and drilling-liner technologies. Three infill wells have been drilled, completed, and put on production by Total in the Elgin/Franklin fields on the UK Continental Shelf. This success was achieved through severely depleted reservoirs—with depletion greater than 800 bar—and has enabled phased HP/HT developments and deep exploration beneath depleted horizons.
机译:尽管钻井/完井行业拥有多年​​经验,但在高压/高温(HP / HT)勘探井上进行钻探仍然是一个挑战。开发井进一步扩大了安全,经济地从HP / HT领域进行生产所需的技术和程序的性能范围。现在是钻探和完井的时间了,随着开采量的增加和泥浆比重窗口(MWW)的减少,矛盾的是似乎更加困难。为了克服这个问题,已经进行了紧张的工程工作,以更好地了解枯竭对压实和压裂梯度的影响,设计和鉴定结合了应力固结技术的新型钻井泥浆系统,并根据部署情况准备了应急方案。扩孔和钻井衬管技术。道达尔在英国大陆架的埃尔金/富兰克林油田钻了三口填充井,并将其投入生产。这一成功是通过严重耗竭的油藏(耗油量超过800巴)获得的,并实现了分阶段的HP / HT开发以及在枯竭层位下进行的深层勘探。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号