首页> 外文会议>2015 3rd International Conference on Control, Engineering amp; Information Technology >Modified block replacement with used items at scheduled periods and at failures
【24h】

Modified block replacement with used items at scheduled periods and at failures

机译:在计划的时间段和发生故障时用旧项目修改块替换

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

In maintenance engineering, it is intended that in a Block Replacement Policy (BRP) model, items are removed and replaced by new ones at failure and at the beginning of each scheduled time kT (fe = 1, 2, ...). It was proved that this kind of strategies has its limits and didn't cover others particular situations. This paper addresses a modified BRP model, that in the same conditions, instead of using new items, used items are provided. The idea behind this model is to minimize the expected total cost while to reduce the impact of the removed items on the environment.
机译:在维护工程中,打算在块替换策略(BRP)模型中,在故障发生时以及在每个计划时间kT的开始(fe = 1、2,...)时,将项目删除并用新项目替换。事实证明,这种策略有其局限性,没有涵盖其他特殊情况。本文提出了一种经过修改的BRP模型,该模型在相同条件下提供了使用过的项目,而不是使用新项目。该模型背后的思想是使预期的总成本最小化,同时减少被移除物品对环境的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号