首页> 外文会议>International Conference on Control, Engineering Information Technology >Modified block replacement with used items at scheduled periods and at failures
【24h】

Modified block replacement with used items at scheduled periods and at failures

机译:修改后的块更换,在预定期间和故障时使用二手项目

获取原文

摘要

In maintenance engineering, it is intended that in a Block Replacement Policy (BRP) model, items are removed and replaced by new ones at failure and at the beginning of each scheduled time kT (fe = 1, 2, ...). It was proved that this kind of strategies has its limits and didn't cover others particular situations. This paper addresses a modified BRP model, that in the same conditions, instead of using new items, used items are provided. The idea behind this model is to minimize the expected total cost while to reduce the impact of the removed items on the environment.
机译:在维护工程中,它旨在在块替换策略(BRP)模型中,在每个预定时间kt(fe = 1,2,......)的失败时,删除项目并替换为新的项目。事实证明,这种策略有其限制,并没有涵盖其他特定情况。本文讨论了修改后的BRP模型,即在相同的条件下,而不是使用新项目,提供使用的项目。该模型背后的想法是最大限度地减少预期的总成本,同时减少已移除的物品对环境的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号