首页> 外文会议>2014 IEEE 38th Annual International Computers, Software and Applications Conference >The Issues of Solving Staffing and Scheduling Problems in Software Development Projects
【24h】

The Issues of Solving Staffing and Scheduling Problems in Software Development Projects

机译:解决软件开发项目中的人员编制和计划问题

获取原文
获取原文并翻译 | 示例

摘要

Search-Based Software Engineering (SBSE) applies search-based optimization techniques in order to solve complex Software Engineering problems. In the recent years there has been a dramatic increase in the number of SBSE applications in areas such as Software Test, Requirements Engineering, and Project Planning. Our focus is on the analysis of the literature in Project Planning, specifically the researches conducted in software project scheduling and resource allocation. SBSE project scheduling and resource allocation solutions basically use optimization algorithms. Considering the results of a previous Systematic Literature Review, in this work, we analyze the issues of adopting these optimization algorithms in what is considered typical settings found in software development organizations. We found few evidence signaling that the expectations of software development organizations are being attended.
机译:基于搜索的软件工程(SBSE)应用基于搜索的优化技术,以解决复杂的软件工程问题。近年来,在软件测试,需求工程和项目计划等领域,SBSE应用程序的数量急剧增加。我们的重点是对项目计划中的文献进行分析,特别是对软件项目计划和资源分配进行的研究。 SBSE项目计划和资源分配解决方案基本上使用优化算法。考虑到先前的系统文献综述的结果,在这项工作中,我们分析了在软件开发组织中发现的典型设置中采用这些优化算法的问题。我们发现几乎没有证据表明正在参加软件开发组织的期望。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号