首页> 外文会议>2012 IEEE International Conference on Automation Science and Engineering. >Scheduling on parallel machines with time constraints and Equipment Health Factors
【24h】

Scheduling on parallel machines with time constraints and Equipment Health Factors

机译:在有时间限制和设备健康因素的并行机器上进行调度

获取原文
获取原文并翻译 | 示例

摘要

In this paper, we are interested in the integration of scheduling and Advanced Process Control (APC) in semiconductor manufacturing. We consider the problem of scheduling jobs of different families on non-identical parallel machines. A special time constraint, associated to each job family, must be satisfied for a machine to remain qualified to process the job family. In addition, we introduce the notion of the risk, modeled as the expected yield resulting from assigning a job to a machine. The objective is to schedule jobs to minimize the combination of three criteria: The sum of completion times, the number of machine disqualifications and the sum of expected yield. We propose an integer linear programming model and heuristics to solve this problem. Numerical experiments are reported.
机译:在本文中,我们对半导体制造中调度与高级过程控制(APC)的集成感兴趣。我们考虑在不同的并行机器上调度不同系列的作业的问题。必须满足与每个工作族相关的特殊时间限制,机器才有资格处理该工作族。此外,我们引入了风险的概念,将其建模为将工作分配给机器所产生的预期收益。目的是安排作业,以最小化以下三个标准的组合:完成时间的总和,机器不合格的数量以及预期的产量之和。我们提出了整数线性规划模型和启发式方法来解决此问题。报告了数值实验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号