首页> 外文会议>2011 rapid excavation and tunneling conference >DESIGN OF COMPENSATION GROUTING FOR TWIN TUNNELS AND A STATION IN TORONTO
【24h】

DESIGN OF COMPENSATION GROUTING FOR TWIN TUNNELS AND A STATION IN TORONTO

机译:多伦多双隧道和车站的注浆设计

获取原文
获取原文并翻译 | 示例

摘要

The Toronto-York Spadina Subway Extension includes 8.6 km of twin bored tunnelrnand six stations. At York University the station will be constructed adjacent to thernprominent Schulich School of Business, with the two running tunnels passing directlyrnbeneath the building. This paper describes the approach used to assess the buildingrnstructure and its complex existing foundations. The development and design of a compensationrngrouting program to protect the building from the tunnels and station excavation,rnis then described together with the monitoring necessary to control the grouting.
机译:多伦多-约克Spadina地铁延伸段包括8.6公里的双隧道隧道和6个车站。在约克大学,车站将建在著名的舒利希商学院附近,两条运行的隧道直接穿过建筑物下方。本文介绍了用于评估建筑结构及其复杂现有基础的方法。然后介绍补偿灌浆程序的开发和设计,以防止建筑物受到隧道和车站开挖的影响,并介绍控制灌浆所需的监控。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号