EXTENDING NEW YORK CITY’S NO. 7 LINE SUBWAY

机译:扩展纽约市7线地铁

获取原文
获取原文并翻译 | 示例

摘要

The primary purpose of the No. 7 Line Extension Project is to promote transitorientedrnredevelopment of the Hudson Yards Area of New York City. The project willrnextend the existing No. 7 (Flushing) Line approximately 2.0 km (1.3 miles) to the westrnside of Manhattan. In December 2007, S3II Tunnel Constructors JV, a joint venture ofrnShea/Skanska/Schiavone was awarded a $1.15 billion contract by the MetropolitanrnTransportation Authority (MTA) to construct twin bored tunnels, five cross passages,rnand the 34th Street Cavern Structure.rnThis paper will focus on the means and methods used to construct the two 6.86 mrn(22'-6") diameter tunnels. It will discuss the tunnel boring machine, hereafter referredrnto as TBM, selection process and support systems; precast segmental lining, requiredrnground freezing, and converging alignment.
机译:7号线扩展项目的主要目的是促进纽约市哈德逊广场地区的公交导向再开发。该项目将把现有的7号线(冲洗)扩展到曼哈顿西侧约2.0公里(1.3英里)。 2007年12月,由Shea / Skanska / Schiavone合资成立的S3II隧道建设商合资公司被大都会交通运输管理局(MTA)授予了一份价值11.5亿美元的合同,用于建造双挖隧道,五个交叉通道和第34街洞穴结构。重点介绍用于建造两条直径为6.86 mrn(22'-6“)的隧道的方式和方法。它将讨论隧道掘进机(以下称为TBM),选择过程和支撑系统;预制分段衬砌,要求的地面冻结以及收敛对齐。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号