【24h】

STABILITY RESEARCH FOR CFST TIED ARCH BRIDGE UNDER TRANSVERSE WIND LOAD

机译:横向风荷载下钢管混凝土系拱桥的稳定性研究

获取原文

摘要

Based on a concrete filled steel tubular (CFST) tied arch bridge project, the instability caused by transverse wind load in bridge completion state is analyzed. The unified theory of CFST is applied to analysis the dual nonlinear stability of the bridge. Various factors, including arch rib initial imperfection, geometry and material nonlinearity related to stability analysis, are fully considered. The results show that the transverse wind load with high critical wind speed can cause aerostatic lateral buckling. The relatively small lateral buckling displacement reveals that geometry nonlinearity influence is trivial. Material nonlinearity is the main factor which affects the ultimate bearing capacity.
机译:以钢管混凝土系杆拱桥工程为基础,分析了桥梁完工状态下横向风荷载引起的失稳。运用CFST统一理论分析桥梁的双重非线性稳定性。充分考虑了各种因素,包括拱肋的初始缺陷,与稳定性分析有关的几何形状和材料非线性。结果表明,临界风速高的横向风荷载会引起静力侧向屈曲。较小的横向屈曲位移表明,几何非线性影响微不足道。材料非线性是影响极限承载力的主要因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号