【24h】

Top Ten Scheduling Mistakesand How to Prevent Them

机译:排定十大错误以及如何预防错误

获取原文
获取原文并翻译 | 示例

摘要

Project personnel typically know how to use a scheduling software tool suchrnas Primavera or Microsoft Project, either from a training course, mentoring from colleaguesrnor self-learning. Unfortunately, many people preparing schedules do not understand basicrnscheduling concepts and therefore use incorrect techniques in preparing and maintainingrntheir schedules. This paper is based on observations made by the author in reviewingrnnumerous project schedules for clients over the past several years. Most schedules containedrnerrors that greatly reduced the accuracy of the schedule. Based on these reviews, this talkrnwill present the top 10 mistakes people make with project schedules, and describe how thesernmistakes can make a schedule very misleading and incorrect. This presentation will alsorndiscuss the correct techniques that should be used, along with a recommended procedurernfor preparing schedules. This talk should be of interest to people who currently preparernschedules and want pointers on how to create more effective schedules. If you believe yournare a skilled scheduler, read this paper to see whether you are making any of the commonrnscheduling errors. You may be surprised!
机译:项目人员通常从培训课程,同事的指导或自学中知道如何使用调度软件工具,例如Primavera或Microsoft Project。不幸的是,许多准备时间表的人不了解基本的时间表概念,因此在准备和维护时间表时使用了不正确的技术。本文基于作者在回顾过去几年中为客户提供的众多项目进度表中的观察结果。大多数时间表包含错误,这些错误大大降低了时间表的准确性。基于这些评论,本演讲将介绍人们在项目进度表中犯下的十大错误,并描述误解如何使进度表非常误导和不正确。该演示文稿还将讨论应使用的正确技术,以及建议的准备时间表的程序。当前正在准备时间表并希望获得有关如何创建更有效时间表的指针的人应该对此演讲感兴趣。如果您相信自己是一个熟练的调度员,请阅读本白皮书,以查看您是否犯了任何常见的调度错误。您可能会感到惊讶!

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号