In 1992 an Integrated Gasification in Combined Cycle (IGCC) plant in Puertollano (Spain) was launched as a THERMIE Targeted Project to demonstrate the feasibility of the European IGCC technology. Now that this plant is running in commercial operation, it proves the use of coal with high efficiency in an environmentally friendly manner. The Puertollano IGCC plant design innovative features focus on two main targets: improved efficiency (45% net, ISO conditions) and reduced emissions. The design concept is arranged at the maximum integration level (specially, the air streams and nitrogen network) and large capacity components (2600 t/day gasifier and 200 MW gas turbine rating) were selected. Works started at the site in April 1993, and mechanical erection of the Combined Cycle Plant began in June 1994. The first gas turbine operation with natural gas was carried out in April 1996 and in September 1996, the combined cycle 100 hours test was undertook. The first gasifier firing on design feedstock took place in December 1997, in August 1999 the IGCC 100 hours test was undertook. Between February and March 2000, ELCOGAS proved the flexibility of the gasification process by carrying out four tests using different coal/coke mixtures (respectively 54/46, 58/42, 42/55 and 39/61 in weight) over 525 operating hours. Until May 2001, 7537 h of operating gasifier have been accumulated. The net electricity production with coal gasification is currently 1379442 MWh and the Gas turbine maximum achieved load on coal gas operation has been 197.6 MW.
机译:1992年,作为THERMIE的目标项目启动了位于西班牙Puertollano的联合气化联合循环(IGCC)厂,以证明欧洲IGCC技术的可行性。现在,该工厂已经投入商业运营,它以环保的方式证明了煤炭的高效利用。 Puertollano IGCC工厂的设计创新特点着重于两个主要目标:提高效率(45%净值,ISO条件)和减少排放。该设计概念以最大集成水平(特别是气流和氮气网络)布置,并选择了大容量组件(每天2600吨气化炉和200兆瓦燃气轮机额定功率)。 1993年4月在现场开始工作,1994年6月开始对联合循环工厂进行机械安装。1996年4月进行了首次天然气燃气轮机运行,1996年9月进行了联合循环100小时试验。 1997年12月进行了首次气化炉燃烧设计原料的燃烧,1999年8月进行了IGCC 100小时试验。在2000年2月至2000年3月之间,ELCOGAS通过在525个工作小时内使用不同的煤/焦炭混合物(分别为54 / 46、58 / 42、42 / 55和39/61重量)进行了四项测试,证明了气化工艺的灵活性。截止2001年5月,已累计运行气化炉7537小时。煤气化的净发电量目前为1379442兆瓦时,燃气轮机在煤气运行中实现的最大负荷为197.6兆瓦。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号