Performance of a Drainage Tunnel and Subvertical Drain System

机译:排水隧道和地下排水系统的性能

获取原文
获取原文并翻译 | 示例

摘要

The construction of two drainage tunnels and the associated subvertical drain system at the Po Shanrnarea in Hong Kong was completed in December 2009. This project is the fi rst of its kind to utiliserndrainage tunnels and a network of subvertical drains to regulate the groundwater table to enhancernthe long-term stability of the hillside of Po Shan area.rnThe groundwater levels, monitored by preinstalled piezometers, once exhibited dramatic dropsrnduring drilling of the subvertical drains; however, have recovered from natural replenishment afterrneffectively plugging of the drains. The level of groundwater drawdown is in line with the designrnfunction of the subvertical drains. In order to understand the groundwater fl ow pattern in thernPo Shan area during and after construction and to set out operation schemes for the subvertical drainrnsystem so as to control the groundwater table in the Po Shan area, a post-construction review hasrnbeen carried out to examine the behaviour of the drainage system and its impact on the surroundingrnsubsurface groundwater fl ow.rnThis paper presents a review of the groundwater monitoring data during and after the constructionrnof the drainage tunnel system covering a period of over 3.5 years. A simplifi ed conceptual hydrologicalrnmodel is developed, which has been verifi ed by the monitoring data, to capture the key elements withrnregard to groundwater variations in different stages of the construction. The performance of therntunnel and subvertical drain system as revealed from these fi eld measurements is discussed.
机译:2009年12月,在香港的宝那那雷(Po Shanrnarea)建造了两个排水隧道和相关的地下排水系统。该项目是利用排水隧道和地下排水网络调节地下水位以提高地下水利用率的同类项目中的第一个。宝山地区山坡的长期稳定。地下水位,通过预先安装的压力计监测,曾在垂直排水沟的钻井过程中出现急剧下降;但是,在有效地堵塞排水管之后,已经从自然补给中恢复了过来。地下水水位下降与地下垂直排水口的设计功能一致。为了了解宝山地区在施工过程中和施工后的地下水流量模式,并为地下排水系统制定运行方案,以控制宝山地区的地下水位,已经进行了施工后审查,以检查排水系统的行为及其对周围地下地下水流量的影响。本文对排水隧道系统施工期间和之后的地下水监测数据进行了回顾,涵盖了3.5年以上的时间。建立了简化的概念水文模型,该模型已通过监测数据进行了验证,以捕获与施工不同阶段的地下水变化无关的关键要素。从这些领域的测量结果揭示了隧道和地下排水系统的性能。

著录项

  • 来源
  • 会议地点 Auckland(NZ)
  • 作者

    J Y C Lo; S F Chau; J C Y Cheuk;

  • 作者单位

    AECOM Asia Co Ltd, 20/F Grand Central Plaza, Tower 2, 138 Shatin Rural Committee Road, Shatin NT, Hong Kong. Email: Joseph.lo@aecom.com;

    AECOM Asia Co Ltd, 20/F Grand Central Plaza, Tower 2, 138 Shatin Rural Committee Road, Shatin NT, Hong Kong. Email: Shufan.chau@aecom.com;

    AECOM Asia Co Ltd, 20/F Grand Central Plaza, Tower 2, 138 Shatin Rural Committee Road, Shatin NT, Hong Kong. Email: Johnny.cheuk@aecom.com;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 隧道工程;地下建筑;