Investigations for Proposed Upgrade of the Homer Tunnel, New Zealand

机译:新西兰荷马隧道拟议升级的调查

获取原文
获取原文并翻译 | 示例

摘要

The Homer Tunnel is located in a remote area of the South Island of New Zealand and carries largernnumbers of tourists to Milford Sound through an avalanche prone area. The tunnel is 1280 m longrnwith a steep ten per cent unidirectional grade descending to the west. Construction of the tunnelrnbegan in the 1930s and was completed to a nominal 6 m width in 1954. In 1996, two passing bays werernstripped-out to accommodate bi-directional fl ow of tourist coaches. During all phases of constructionrnand widening there have been episodes of strain bursting.rnThe condition of the tunnel and standard of internal services is below current internationalrnpractice, principally in terms of; in-tunnel air quality, fi re life safety, ground support, and road safety.rnA number of near-miss events have occurred involving coach fi res on the approaches and insidernthe tunnel. The national road authority, NZTA, is considering a substantial investment to improvernamenity and safety of the tunnel.rnThis paper describes the rationale for the proposed upgrade works and the investigations undertakenrnto enable that design. A holistic approach to road tunnel safety has been adopted that balances thernkey interrelated safety drivers, namely; tunnel lining, traffi c operations, ventilation, power supplyrnand egress while ensuring continuity of safe access to Milford Sound.
机译:荷马隧道位于新西兰南岛的一个偏远地区,通过雪崩易发区将更多的游客带到米尔福德峡湾。隧道长1280 m,向西下降10%的陡峭单向坡度。隧道的建设始于1930年代,并于1954年完成了标称宽度为6 m的建设。1996年,挖出了两个经过的海湾,以容纳双向旅游客流。在施工和扩建的所有阶段中,都发生了应变破裂的事件。隧道的状况和内部服务水平低于当前的国际惯例,主要是在以下方面:隧道内的空气质量,生命安全,地面支持和道路安全。发生了许多事故征候,涉及客车着陆和隧道内的事故。国家道路管理局(NZTA)正在考虑大量投资以提高隧道的知名度和安全性。本文描述了拟议的升级工程的原理以及为实现该设计而进行的调查。已采用一种整体方法来解决公路隧道安全问题,从而平衡了相互关联的关键安全驱动因素,即:隧道衬砌,交通运营,通风,电力供应和出口,同时确保连续安全地通往米尔福德峡湾。

著录项

  • 来源
  • 会议地点 Auckland(NZ)
  • 作者单位

    Ground Engineering and Tunnelling, AECOM New Zealand Ltd, PO Box 4241, Shortland Street, Auckland 1140, New Zealand Ltd. Email: andrew.campbell@aecom.com;

    Stacey Agnew Pty Ltd, PO Box 351, Goodna Qld 4300. Email: nick@staceyagnew.com;

    AECOM New Zealand Ltd, PO Box 4241, Shortland Street, Auckland 1140, New Zealand. Email: mathew.avery@aecom.com;

    The New Zealand Transport Agency, PO Box 5245, Moray Place, Dunedin 9058, New Zealand. Email: niclas.johansson@nzta.govt.nz;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 隧道工程;地下建筑;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号