...
首页> 外文期刊>Tunnel >New Zealand Wellington Tunnels receive Fire Protection Upgrade
【24h】

New Zealand Wellington Tunnels receive Fire Protection Upgrade

机译:新西兰惠灵顿隧道获得防火升级

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Fire protection specialist Wor-mald, a Tyco Business, has installed comprehensive fire protection Solutions in both the Mount Victoria Tunnel and the Terrace Tunnel in Wellington/ NZ, as part of Upgrade work undertaken by the Wellington Tunnels Alliance.The Wellington Tunnel Alliance incorporates the New Zealand Transport Agency, Leighton Contractors Pty Ltd, Aecom and Sinclair Knight Merz (SKM). The tunnel works included upgrading fire fighting, lighting, Ventilation and drainage Systems, building new tunnel control buildings and some earthquake safety improvements. Wormald was chosen to supply and install the fire suppression Systems and equipment.The Upgrades aim to ensure that the tunnels continue to operate effectively and meet modern safety Standards.
机译:作为惠灵顿隧道联盟进行升级工作的一部分,泰科公司的防火专家Wor-mald已在维多利亚山隧道和纽西兰惠灵顿的梯田隧道安装了全面的防火解决方案。新西兰运输局,Leighton Contractors Pty Ltd,Aecom和Sinclair Knight Merz(SKM)。隧道工程包括升级消防,照明,通风和排水系统,建造新的隧道控制大楼以及一些地震安全性改进。 Wormald被选中供应和安装灭火系统和设备。升级旨在确保隧道继续有效运行并符合现代安全标准。

著录项

  • 来源
    《Tunnel》 |2013年第4期|67-67|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号