REMEDIATION OF A MANUFACTURED GAS PLANT SITE IN PRESCOTT, ARIZONA

机译:亚利桑那州普雷斯科特的一家人工煤气厂的修复

获取原文
获取原文并翻译 | 示例

摘要

From the early 1800’s through the middle of the 20th Century, manufactured gas plantsrn(MGPs) generated gas from coal or oil to fuel lighting and heating throughout the United States.rnMGP sites vary in the types and quantities of wastes remaining, based on the feedstock andrnmanufacturing processes used. Inorganics, metals, VOCs, and polynuclear aromatic compoundsrn(PAHs) may be found at MGP sites. Last year Arizona Public Service Company (APS)rnremediated an MGP site in Prescott, Arizona, which operated from 1909 until 1949.rnSince 1992, APS conducted a series of investigations to characterize soil, groundwater,rnand surface water impacts from the former MGP operations and to evaluate the groundwatersurfacernwater interaction at the Site. Investigations found elevated concentrations of PAHs,rntotal petroleum hydrocarbons (TPH), benzene, cyanide, and lead in soil. Cyanide,rn(benzo(a)pyrene, and nitrate, were detected in groundwater collected from Site monitoringrnwells above applicable Aquifer Water Quality Standards (AWQS). In addition dense nonaqueousrnphase liquid was found in one groundwater monitor well and subsequently found inrnthe fractured bedrock beneath a portion of the facility. Groundwater impacts were veryrnlocalized. Water samples collected from Miller Creek occasionally have shown slightly elevatedrncyanide concentrations.rnIn 1999, APS developed and submitted a Remedial Action Plan (RAP) to the ArizonarnDepartment of Environmental Quality (ADEQ) Voluntary Remediation Program (VRP). AfterrnADEQ approval of the RAP, remediation began at the Site in late 1999 and was completed inrnJanuary 2001. The goal of the RAP was to remediate soil impacted by MGP-related compoundsrnto levels that are protective of human health and water quality to the maximum extentrnpracticable. A total of 101,000 tons of soil were excavated and treated. A total of 819,000 gallonsrnof water were treated and discharged to the sanitary sewer. Remediation activities wererncomplicated by several factors including: maintaining operations at an active substation andrnconstruction yard; installation of shoring around the substation; location near a residentialrnneighborhood; re-routing and restoring of Miller Creek; and, relocating and excavating aroundrnactive utilities, sewer lines, water lines and fiber-optic cables.
机译:从1800年代初到20世纪中期,全美的人造煤气厂(MGPs)从煤或石油中产生天然气,以供照明和取暖。根据原料,MGP厂址所剩废物的类型和数量各不相同。所使用的制造工艺。在MGP站点可能会发现无机物,金属,VOC和多核芳香族化合物。去年,亚利桑那州公共服务公司(APS)对位于亚利桑那州普雷斯科特的MGP站点进行了修复,该站点于1909年至1949年运营.1992年以来,APS进行了一系列调查,以表征前MGP运营和改造对土壤,地下水,地下水和地表水的影响。评估现场的地下水与地表水的相互作用。调查发现土壤中PAHs,总石油烃(TPH),苯,氰化物和铅的浓度升高。在高于适用的含水层水质标准(AWQS)的现场监测井中采集的地下水中检测到氰化物,苯并(a)py和硝酸盐,此外,在一个地下水监测井中发现了稠密的非水相液体,随后发现其下方的裂缝基岩中1999年,APS制定并向亚利桑那州环境质量部(ADEQ)自愿补救计划提交了补救行动计划(RAP),并向其提交了补救行动计划(RAP)。 (VRP)。在获得RAP的ADEQ批准后,修复工作于1999年底在现场开始,并于2001年1月完成。RAP的目标是将受MGP相关化合物影响的土壤修复至可保护人类健康和水质的水平。挖出并处理了总计101,000吨的土壤。总共处理了819,000加仑的水,并将其排入下水道。补救活动的复杂化有几个因素,包括:在现役的变电站和建造场内维持操作;在变电站周围安装支柱;靠近居民区的位置;重新路由和恢复Miller Creek;以及在附近的公用设施,下水道管线,输水管线和光纤电缆附近搬迁和开挖。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号