首页> 外国专利> Construction method of rotary pile, method of manufacturing pile group, and pile group

Construction method of rotary pile, method of manufacturing pile group, and pile group

机译:旋转桩施工方法,制造桩基制造方法及桩基

摘要

The rotary pile can be prevented from being filled in the rotary piles when the rotary piles are press fitted into the ground.The rotary pile 17 provided with the blade 16 is inserted into the ground 91, and is based on the measurement process for measuring the upper load weight of the rotary pile 17 during the press fit of the rotary pile 17 with respect to the ground 91, and based on the measurement results obtained in the measurement process The present invention is characterized in that it is provided with a judging step for judging whether or not the sediment is stuck in the rotary pile 17.For example, the measurement step includes measuring at least one of the rotational torque and the penetration amount of the rotary pile 17.
机译:当旋转桩压入地面时,可以防止旋转桩填充在旋转桩中。设置有刀片16的旋转桩17插入地面91中,并基于测量的测量过程 旋转桩17在旋转桩17相对于地91的压力件17期间的上部负载重量,并且基于在测量过程中获得的测量结果,本发明的特征在于它具有判断步骤 判断沉积物是否卡在旋转桩17中。对于例如,测量步骤包括测量旋转桩17的旋转扭矩和渗透量中的至少一个。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号