首页> 外国专利> MANAGING TOP-OFF CHARGING AND DISCHARGE TESTING OF BATTERY PACKS TO OPTIMIZE CAPACITY

MANAGING TOP-OFF CHARGING AND DISCHARGE TESTING OF BATTERY PACKS TO OPTIMIZE CAPACITY

机译:管理电池组的顶部充电和放电测试以优化容量

摘要

Computer-implemented managing of battery capacity within a battery system is provided. The managing includes obtaining, by one or more processors, data representative of a number (N) of battery packs in the battery system, and ascertaining, by the processor(s), a battery pack self-discharge time interval (TD) from full-charge to a partially discharged threshold for initiating top-off charging. The managing also includes determining, by the processor(s), a charge-staggering time interval (TS) using the number (N) of battery packs in the battery system and the ascertained battery pack self-discharge time interval (TD), and staggering, by the processor(s), top-off charging of the battery packs of the N battery packs in the battery system using, at least in part, the charge-staggering time interval (TS).
机译:提供计算机实施的电池系统内的电池容量的管理。 管理包括由一个或多个处理器获得的数据代表电池系统中的电池组的数字(n),并通过处理器确定电池组自放电时间间隔(Td) - 充电到部分放电的阈值,以启动最新充电。 管理还包括由处理器(S),使用电池系统中的电池组的数量(n)和所确定的电池组自放电时间间隔(Td),并且 通过处理器,通过处理器在电池系统中的电池组的充电,使用至少部分地是电荷交错的时间间隔(TS)来令人讨厌。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号