首页> 外国专利> For a pressure high furnace blast furnace gas cleaning plant

For a pressure high furnace blast furnace gas cleaning plant

机译:用于高压高炉高炉煤气净化设备

摘要

The throat gas is piped to a first purifier, =1 prewasher and then to a washer (I) using differential press. control, followed by a separator for the droplets formed. Two washers of types (I) are used, the novelty being that one is used to maintain a constant press. in the blast furnace throat, the other leading to an expansion turbine driving a generator. The two washers (I) can be connected either in series or in parallel, and the flow of gas to the turbine is pref.four times the flow in the other washer. Max. generation of electricity without affecting the gas press. in the throat is achieved
机译:喉气通过管道输送到> = 1的预洗器的第一纯化器,然后通过压差机输送到洗涤器(I)。控制,然后是用于形成液滴的分离器。使用了两种类型(I)的垫圈,其新颖之处在于,其中一种用于保持恒定的压力。在高炉喉道中,另一个导致膨胀涡轮机驱动发电机。两个垫圈(I)可以串联或并联连接,流向涡轮的气体流量是另一个垫圈的流量的四倍。最高发电而不会影响燃气压力机。在喉咙里实现

著录项

  • 公开/公告号DE2439757B2

    专利类型

  • 公开/公告日1976-07-22

    原文格式PDF

  • 申请/专利权人

    申请/专利号DE19742439757

  • 发明设计人

    申请日1974-08-20

  • 分类号C21B7/22;

  • 国家 DE

  • 入库时间 2022-08-23 02:05:07

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号