首页> 外国专利> Blast furnace gas cleaning plant for pressure high furnaces

Blast furnace gas cleaning plant for pressure high furnaces

机译:高压力炉用高炉煤气净化设备

摘要

The gases emerging from a high-pressure gas furnace are subject to coarse particle separation and then to washing and scrubbing with water before driving an expansion turbine which has a gas bypass so that the turbine can be cut off. The scrubbing water recycled to the scrubber when the turbine is cut off, is permitted to traverse a cooler of the washing-water recovery unit but, when the turbine is operative, the scrubbing water bypasses the cooler. The water introduced into the scrubber can thus have a temperature of about 25 DEG C. when the turbine is bypassed and about 50 DEG C. when it is effective.
机译:从高压煤气炉中排出的气体经过粗大的颗粒分离,然后在驱动具有气体旁路的膨胀透平机之前用水洗涤和洗涤,从而可以切断透平机。当涡轮机被切断时,再循环到洗涤器的洗涤水被允许横穿洗涤水回收单元的冷却器,但是当涡轮机运转时,洗涤水绕过冷却器。因此,当涡轮机被旁路时,引入洗涤器的水的温度可以约为25℃,而当其有效时,其温度可以约为50℃。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号