首页> 外国专利> Method and apparatus for the shaping of one of the sealing accommodation of a tube of the tube serving for pipe connections, in particular sleeves tube compounds, in the warmth deformable tubes, preferably made of plastic

Method and apparatus for the shaping of one of the sealing accommodation of a tube of the tube serving for pipe connections, in particular sleeves tube compounds, in the warmth deformable tubes, preferably made of plastic

机译:用于在优选地由塑料制成的可热变形的管中使用于管连接的管的管,特别是套筒管复合物的密封容纳部之一成形的方法和装置

摘要

1450821 Forming grooved bell ends on pipes JOHNS-MANVILLE CORP 21 Jan 1974 [23 Oct 1973] 2684/74 Heading B5A [Also in Division F2] An internal groove is formed in the bell end of a PVC pipe by pushing the pipe over a hard rubber sealing gasket projecting from a supporting core so that a groove is formed by the gasket, and then deforming the groove (see Fig. 12) to reduce its extent. The gasket is left in the groove or can be replaced; several gaskets and retaining members can be used. As described, the gasket 26 (Fig. 10) is seated in a recess of a lubricated and heated steel core 54. A plurality of pivoted ramp bars 68 are projected from the core by rods 73 actuated by a frusto-conical surface 71 (Fig. 5). The heated pipe end is pushed over the core, ramp bars and gasket until it meets a stop 56, whereafter the ramp bars are spring retracted flush with the core (Fig. 12) and the pipe end is drawn on to the core by suction and air pressure. A plurality of plungers 90, 104 mounted on an annular support 72 (Fig. 5) are operated by pistons or linkages to deform the pipe groove about the gasket (Fig. 12) to lock the gasket in position. After fluid cooling, the pipe is withdrawn from the core, with the gasket riding up an inclined surface of the core recess. The plungers 90, 104 comprise a plurality of straight edged members 94 (Fig. 7) that form a plurality of opposing or staggered locking projections in the pipe. Alternatively, arcuate plungers form a continuous locking projection adjacent the groove edges or in the body of the groove.
机译:1450821在管道上形成带凹槽的钟形端部JOHNS-MANVILLE CORP 1974年1月21日[1973年10月23日] 2684/74标题B5A [也在F2分部中]通过在硬管上推动管道,在PVC管道的钟形端部中形成内部凹槽橡胶密封垫圈从支撑芯突出,从而在垫圈上形成凹槽,然后使凹槽变形(见图12)以减小其范围。垫圈留在凹槽中或可以更换;可以使用几个垫圈和固定件。如所描述的,垫圈26(图10)位于润滑和加热的钢芯54的凹槽中。通过由截头圆锥形表面71驱动的杆73(图10),多个枢转的斜坡杆68从芯突出。 5)。将加热后的管端推到芯子,斜杆和垫圈上,直到碰到挡块56,然后将斜杆弹簧缩回与芯子齐平(图12),然后通过吸力将管端拉到芯子上。空气压力。安装在环形支撑件72(图5)上的多个柱塞90、104由活塞或连杆操作,以使围绕垫圈(图12)的管槽变形以将垫圈锁定在适当的位置。流体冷却后,将管道从岩心中抽出,垫圈沿着岩心凹部的倾斜表面骑行。柱塞90、104包括多个直边构件94(图7),其在管中形成多个相对或交错的锁定突起。可替代地,弓形柱塞在凹槽边缘附近或在凹槽的主体中形成连续的锁定突起。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号