首页> 外国专利> Railway track laying method - consists of digging trenches and filling them with reinforcements over which concrete is poured before embedding sleepers

Railway track laying method - consists of digging trenches and filling them with reinforcements over which concrete is poured before embedding sleepers

机译:铁路轨道铺设方法-包括挖沟并用钢筋填充,在埋入轨枕之前将混凝土浇筑到上面

摘要

The railway line resting on a lengthwise foundation made of concrete cast in situ, is laid by first making a trench (1, 1') of a suitable size and following the line of the proposed track. Inside each trench (1, 1') is placed reinforcement metal (2, 2'). Sleepers (3, 4) are placed over each trench and are spaced out at regular intervals. The rails (13, 14) are placed on the sleepers (3, 4). The sleepers (3, 4) and the rail are wedged in position so that the rail is correctly placed and is at the right level. The rail (13, 14) is then joined to the sleepers (3, 4). Concrete is then poured over the metal reinforcements in the trenches (1, 1'), to form a longitudinal sleeper and trapping the base of the sleepers (3, 4) embedded into the top of the longitudinal sleeper.
机译:通过首先制作合适尺寸的沟槽(1、1'),然后沿着拟建的轨道线铺设铺设在就地浇铸混凝土纵向基础上的铁路线。在每个沟槽(1、1')的内部放置增强金属(2、2')。枕木(3,4)放置在每个沟槽上方,并以规则的间隔隔开。轨道(13、14)放置在轨枕(3、4)上。轨枕(3、4)和滑轨楔入到位,以便滑轨正确放置并位于正确的高度。然后将轨道(13、14)连接到轨枕(3、4)。然后将混凝土倒在沟槽(1、1')中的金属加强件上,以形成纵向轨枕,并捕获嵌入纵向轨枕顶部的轨枕(3、4)的底部。

著录项

  • 公开/公告号FR2385844B1

    专利类型

  • 公开/公告日1982-02-05

    原文格式PDF

  • 申请/专利权人 ATELIERS CONSTRUCTION ABBAYE;

    申请/专利号FR19770009216

  • 发明设计人

    申请日1977-03-28

  • 分类号E01B29/05;

  • 国家 FR

  • 入库时间 2022-08-22 12:31:47

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号