首页> 外国专利> TREATMENT OF PILE HEAD IN CONSTRUCTING PILE FOOTING

TREATMENT OF PILE HEAD IN CONSTRUCTING PILE FOOTING

机译:桩基施工中桩头的处理

摘要

PURPOSE:To obtain a pile having strong bearing force by a method in which a shoe block coupled with a tubular body penetrated underground is brought down by a pressing device having plural jacks to consolidate slime, and a coagulating material is placed on the shoe block. CONSTITUTION:A pressure liquid is orderly supplied from a liquid pressure source to each jack 34 through a hose 42, and each piece 16 is vertically pressed by operating orderly each jack 34. Whereupon, a steel wire 20 hanging each piece 16 is cut off, the piece goes down along the other piece and a strip 24, whereby slime 28 deposited below the tubular body 12 is consolidated. Then, the wire 36 is pulled up, the pressing device 20 is removed, and then cement concrete or mortar 64 is placed on the shoe block 18.
机译:用途:为了获得具有强支撑力的桩,该方法是通过将具有多个千斤顶的压实装置将与钻入地下的管状体连接的鞋块放下以固结粘液,然后在鞋块上放置凝结材料。组成:压力液体通过软管42从液压源有序地供应到每个千斤顶34,通过有序操作每个千斤顶34垂直压紧每个零件16。于是,切断了悬挂在每个零件16上的钢丝20,该块沿着另一块和一条带下降,从而使沉积在管状主体12下方的粘液28固结。然后,拉起线36,移除加压装置20,然后将水泥混凝土或砂浆64放置在鞋座18上。

著录项

  • 公开/公告号JPS5858320A

    专利类型

  • 公开/公告日1983-04-06

    原文格式PDF

  • 申请/专利权人 KUMAGAIGUMI:KK;

    申请/专利号JP19810153808

  • 发明设计人 MASUZAWA SACHIO;

    申请日1981-09-30

  • 分类号E02D5/34;E02D5/62;

  • 国家 JP

  • 入库时间 2022-08-22 11:22:15

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号