首页> 外国专利> programlagerstyret telekommunikationsanlaeg

programlagerstyret telekommunikationsanlaeg

机译:Program Camp Wash电信计划Sanlaeg

摘要

In a program store controlled telecommunications system the system function blocks 2 are controlled in co-operation with a computer system which comprises a number of processors 1, 4. The determination of the order in which the system functions are to be carried out is included in the co-operation functions. One of the processors is selected with regard to exclusively controlling an independent program store controlled signal connection system 3 which carries out the co-operation functions by connecting co-operation signals between the system's function blocks 2 and at least one central processor 1. The signal connecting system's processor 4 controls a co-operation instruction store 8, co-operation function blocks 9, 10, 12, 13 for buffer storage of the co-operation signals and prioritizing function blocks 11, 15 for determining the order in which the incoming signals are connected and for allocating the signals addressed to the central processors 1 to priority levels. A system with flexible control loading is obtained using monitoring of the signal quantity which is taken to the central processors 1. Using a function block for flexible control load distribution 16 the signal connecting system 3 carries out a control load redistribution and/or reduces the signal connection to a central processor 1 if this is overloaded. IMAGE
机译:在程序存储控制的电信系统中,与包括多个处理器1、4的计算机系统协作来控制系统功能块2。确定执行系统功能的顺序包括在其中。合作功能。选择一个处理器来专门控制一个独立的程序存储受控信号连接系统3,该系统通过在系统功能块2和至少一个中央处理器1之间连接协作信号来执行协作功能。连接系统的处理器4控制合作指令存储8,合作功能块9、10、12、13,用于缓冲存储合作信号,并对功能块11、15进行优先级确定输入信号的顺序连接信号C1和B2用于将寻址到中央处理器1的信号分配给优先级。通过监视输入到中央处理器1的信号量,可以获得具有灵活控制负载的系统。使用功能块用于灵活控制负载分配,信号连接系统3进行控制负载重新分配和/或减少信号如果中央处理器1过载,则连接。 <图像>

著录项

相似文献

  • 专利
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号