首页> 外国专利> procedure for the manufacture of a joint tape for rising gebäudewände in civil engineering, as well as a device for implementing the procedure

procedure for the manufacture of a joint tape for rising gebäudewände in civil engineering, as well as a device for implementing the procedure

机译:土木工程中用于制造上升的gebäudewände的接合带的制造程序,以及实施该程序的装置

摘要

1. Method for the production of a water-stop strip (4 to 21) for building walls in structural and civil engineering, in which a water-stop strip (4 to 21) comprising a plastics profile (6, 8, 11, 12, 15, 16, 18, 19, 20, 21) is produced from extrusions, and is provided with reinforcement rods or strips (1 to 3; 4, 5) connected to the water-stop strip (4 to 21) which run solely at right angles to its length and at spaced intervals, characterised in that the flow from a fishtail die (27) is firstly symmetrically divided in thickness, thereafter the reinforcement rods or strips (1 to 3; 4, 5) are introduced between the layers singly, in periodic sequence with the speed of extrusion, and at right-angles to the length of the strip and to the direction of movement of the layers (30, 31), and then the layers (30, 31) are brought together behind each introduced reinforcement (1 to 3; 4, 5) with the help of a vacuum, and are merged into one body (42) in which the reinforcements (1 to 3; 4, 5) are embedded throughout their entire length by enclosing their ends (4, 5).
机译:1.一种用于在结构和土木工程中用于建筑墙壁的止水带(4至21)的制造方法,其中,止水带(4至21)包括塑料型材(6、8、11、12) ,15、16、18、19、20、21)是通过挤压制成的,并配有连接到止水带(4至21)的加强棒或条(1至3; 4,5)。与其长度成直角并间隔一定距离,其特征在于,鱼尾模(27)的流动首先对称地分配厚度,然后将增强棒或条(1至3; 4、5)引入各层之间单独地,以挤出速度的周期性顺序,并且与带的长度以及层(30、31)的运动方向成直角,然后将层(30、31)聚在一起每个引入的增强材料(1至3; 4、5)借助于真空作用,并合并为一个本体(42),其中增强材料(1至3; 4、5)或通过将其末端(4、5)封闭起来,将其嵌入整个长度。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号