METHOD OF BUILDING UNDERGROUND CONTINUOUS WALL IN PILE SUPPORT BUILDING HAVING UNDERGROUND FLOOR AND CAST-IN-PLACE CONCRETE PILE
METHOD OF BUILDING UNDERGROUND CONTINUOUS WALL IN PILE SUPPORT BUILDING HAVING UNDERGROUND FLOOR AND CAST-IN-PLACE CONCRETE PILE
展开▼
机译:具有地下楼板和现浇混凝土桩的桩支撑建筑物的地下连续墙建造方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE:To reduce a cost, by a method wherein a reinforcing cage for an underground continuous wall and a reinforcing cage for a cast-in-place concrete pile are erected after partition are installed so that concrete is prevented from entering around a post-construction underground body part. CONSTITUTION:A reinforcing cage 7a for an underground wall is overlapped with a reinforcing cage 8a for a cast-in-place concrete pile for integral formation to form a reinforcing cage 9a, and partitions 10 and 11 are installed so that concrete is prevented from entering around a joint between post-construction underground body parts. After the reinforcing cage 9a is erected in an excavated hole 9, concrete is placed. This enables building of a concrete pile simultaneously with placing of concrete for a continuous wall, resulting in possibility to eliminate a work to refill with excavated soil and reexcavate a ground after formation of the concrete pile. Further, this enables reduction of the degree of need for reinforcement of an underbeam.
展开▼