The invention relates to a method of controlling a PFBC power plant in the event of an operational disturbance affecting a turbine unit driven by the plant, for example a load drop out, said plant comprising a bed vessel (12) enclosed within a pressure vessel (10) and surrounded by compressed combustion air, said bed vessel containing a bed (22) of fluidizable particulate material, and a gas turbine-compressor unit (34,38,48) driven by combustion gases from the bed vessel (12). In a hot gas conduit (32) between the bed vessel (12) and a turbine (34) there is a first cut-off valve (54), and in a conduit (50) between a compressor (48) and the bed vessel (12) there is a second cut-off valve (58). Between said conduits (32,50) there is a short-circuit conduit (62) with a third cut-off valve (64). In case of an operational disturbance as mentioned above, the turbine-compressor unit (34,38,48) is cut off from the bed vessel (12) and the pressure vessel (10), respectively, by shutting off said first and second valves (54,58) in the conduits (32,50) between the bed vessel (12) and the turbine (34) and between the compressor (48) and the pressure vessel (10), respectively. At the same time, the bypass valve (64) in the short-circuit conduit (62) is opened. In the event of a lengthy operational disturbance requiring shutdown of the power plant, the combustion gases in the bed vessel (12) are dumped into the atmosphere via a dump conduit (68) and a dump valve (72). When dumping the combustion gases, cooling water is injected into the dump conduit (68) upstream of the dump valve (72) so that the gases are cooled before reaching the dump valve (72). The invention also relates to a power plant having a device (70) for injection of cooling water into a conduit (68) upstream of a dump valve (72) for cooling the hot combustion gases from the bed vessel (12) before they reach the dump valve (72).
机译:本发明涉及一种在操作扰动影响由该设备驱动的涡轮单元(例如,负载下降)的情况下控制PFBC发电厂的方法,所述设备包括封闭在压力容器(12)内的床容器(12)。 10)并被压缩的燃烧空气包围,所述床容器包括可流化颗粒材料床(22),以及由来自床容器(12)的燃烧气体驱动的燃气轮机-压缩机单元(34,38,48)。在床容器(12)和涡轮(34)之间的热气导管(32)中,具有第一截止阀(54),在压缩机(48)和床容器之间的导管(50)中具有第一截止阀。 (12)有第二个截止阀(58)。在所述导管(32,50)之间是具有第三截止阀(64)的短路导管(62)。在如上所述的操作干扰的情况下,通过关闭所述第一阀和第二阀,分别从床容器(12)和压力容器(10)中切断涡轮压缩机单元(34、38、48)。 (54,58)分别位于床容器(12)和涡轮(34)之间以及压缩机(48)和压力容器(10)之间的导管(32,50)中。同时,短路导管(62)中的旁通阀(64)被打开。在需要关闭发电厂的长时间运行干扰的情况下,床容器(12)中的燃烧气体通过排放导管(68)和排放阀(72)排放到大气中。当排放燃烧气体时,冷却水被注入到排放阀(72)上游的排放导管(68)中,从而气体在到达排放阀(72)之前被冷却。本发明还涉及一种具有设备(70)的发电厂,该设备用于将冷却水注入到排放阀(72)上游的导管(68)中,以冷却来自床容器(12)的热燃烧气体在到达燃烧室之前。卸料阀(72)。

著录项

  • 公开/公告号AU2635288A

    专利类型

  • 公开/公告日1989-06-08

    原文格式PDF

  • 申请/专利权人 ABB STAL A.B.;

    申请/专利号AU19880026352

  • 发明设计人 ROINE BRANNSTROM;

    申请日1988-11-30

  • 分类号F23N5/24;F23C7/00;

  • 国家 AU

  • 入库时间 2022-08-22 06:36:03

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号