首页>
外国专利>
PROGRESS SCHEME CONTROL DEVICE FOR CONSTRUCTION WORKS
PROGRESS SCHEME CONTROL DEVICE FOR CONSTRUCTION WORKS
展开▼
机译:建筑工程进度计划控制装置
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE:To direct the command for works to each worker with ease by identifying the construction zones corresponding to the working day by each work based on a progress chart schedule, and thereby compiling a countermeasure table where the working day is adjusted to the respective construction zones so as to be outputted. CONSTITUTION:A progress scheme control device 10 is made up out of a personal computer 12, and of various appliances connected to the input-output port 20 of the personal computer 12. The personal computer 12 is equipped with a CPU 14, a ROM 16, a RAM 18 and the input-output port 20, and these appliances are connected to one another through a bus. The construction zones corresponding to the working day by each work are identified based on a progress chart schedule, and a countermeasure table indicating working day and the construction zone while being adjusted to each other, is compiled by each work so as to be outputted.
展开▼