首页>
外国专利>
PROGRESS SCHEME CONTROL DEVICE FOR CONSTRUCTION WORKS
PROGRESS SCHEME CONTROL DEVICE FOR CONSTRUCTION WORKS
展开▼
机译:建筑工程进度计划控制装置
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE:To easily make a scheme for construction works when there exists no working clay during the term of construction by preparing a progress chart schedule indicating the order of working days by each construction zone where the term of construction is extended by the number of no working day with no change of the work starting day. CONSTITUTION:A progress scheme control, device 10 is made up out of a personal computer 12, and various appliances connected to the input-output port 20 of the personal computer 12. The personal computer 12 is equipped with a CPU 14, a ROM 16, a RAM 18 and the input-output port 20, and these appliances are connected to one another through a bus. And when there exists no working day during the term of construction, a scheme for construction works can easily be made with no change of the work starting day while the number of days for the term of construction is extended by the number of no working day.
展开▼