首页> 外国专利> METHOD OF CONTROL OF TWO-STAGE PREPARATION OF RAW MATERIAL SLIME

METHOD OF CONTROL OF TWO-STAGE PREPARATION OF RAW MATERIAL SLIME

机译:原料胶两阶段制备的控制方法

摘要

the invention u043eu0442u043du043eu0441u0438u0442u0441u00a0 ways u0443u043fu0440u0430u0432u043bu0435u043du0438u00a0 technological processes of construction material industry and can be used in metallurgy and other similar to the technology industry. u043fu043eu0437u0432u043eu043bu00a0u0435u0442 quality u0443u043fu0440u0430u0432u043bu0435u043du0438u00a0.u0434u043bu00a0 u0434u043eu0441u0442u0438u0436u0435u043du0438u00a0 goal u0438u0437u043cu0435u0440u00a0u044eu0442 level of sludge in the u043cu0435u0448u0430u043bu043au0435 between u0441u0442u0430u0434u0438u00a0u043cu0438 milling, is quantized u0438u0437u043cu0435u0440u00a0u044eu0442 tonin grinding after the second stage grinding, the change the u0441u044bu0440u044cu00a0 at first stage lead by a proportional deflection of u0442u043eu043du0438u043du044b milling u0437u0430u0434u0430u043du0438u00a0, count value of the sludge in the second u0438u0437u043cu0435u043du0435u043du0438u00a0 stage grinding, the change of the sludge in the second stage lead bya value equal to u0438u0437u043cu0435u043du0435u043du0438u00a0 flow, if less than u0437u043du0430u0447u0435u043du0438u00a0 u0438u0437u043cu0435u043du0435u043du0438u00a0 flow at the first stage, and the value of the value flow u0438u0437u043cu0435u043du0435u043du0438u00a0 si u0440u044cu00a0 at the first stage, if it is less than the calculated u0437u043du0430u0447u0435u043du0438u00a0 u0438u0437u043cu0435u043du0435u043du0438u00a0 flow sludge at the second stage.the change of sludge in the second stage u043eu0441u0443u0449u0435u0441u0442u0432u043bu00a0u044eu0442 level in u043cu0435u0448u0430u043bu043au0435 in achieving their maximum or minimum values and the time of m. u043eu043cu0435u043du0442u0430 u0438u0437u043cu0435u043du0435u043du0438u00a0 flow sludge at stage two values equal to the average time u043fu0440u0435u0431u044bu0432u0430u043du0438u00a0 u0441u044bu0440u044cu00a0 at the first stage of grinding. 1 il. (l
机译:发明的方法 u043e u0442 u043d u043e u0441 u0438 u0442 u0441 u00a0方式 u0443 u043f u0440 u0430 u0432 u043b u0435 u043d u0438 u00a0的工艺流程可以用于冶金和其他类似技术行业。 u043f u043e u0437 u0432 u043e u043b u00a0 u0435 u0442质量 u0443 u043f u0440 u0430 u0432 u043b u0435 u043d u0438 u00a0。 u0434 u043b u00a0 u00a0 u0441 u0442 u0438 u0436 u0435 u043d u0438 u00a0目标 u0438 u0437 u043c u0435 u0440 u00a0 u044e u0442 u043c u0435 u0448 u0430 u043b 043上的污泥量 u0441 u0442 u0430 u0434 u0438 u00a0 u043c u0438铣削之间的 u0435,在第二阶段磨削后被量化为 u0438 u0437 u043c u043c u0435 u0440 u00a0 u044e u044e u0442 u0441 u044b u0440 u044c u00a0在第一阶段由 u0442 u043e u043d u0438 u043d u044b铣削 u0437 u0430 u0434 u0430 u043d u0438 u00a0的比例偏移导致第二阶段的污泥 u0438 u0437 u043c u0435 u043d u0435 u043d u0438 u00a0第二阶段的污泥变化导致的值等于 u0438 u0437 u0433 u043c u0435 u0435 u043d u0438 u00a0流量,如果小于 u0437 u043d u0430 u0447 u0435 u043d u0438 u00a0 u0438 u04 37 u043c u0435 u043d u0435 u043d u0438 u00a0处于第一阶段,并且值flow u0438 u0437 u043c u0435 u043d u0435 u043d u0438 u00a0 si u0440 如果小于计算的 u0437 u043d u0430 u0447 u0435 u043d u0438 u00a0 u0438 u0437 u043c u0435 u043d u0435 u043d u043d u0438 u00a0流量,则在第一阶段第二阶段的污泥。第二阶段的污泥变化 u043e u0441 u0443 u0449 u0435 u0441 u0442 u0432 u043b u043b u00a0 u044e u0442在 u043c u0435 u0448 u0430 u043b中的水平 u043a u0435达到其最大值或最小值和时间m。 u043e u043c u0435 u043d u0442 u0430 u0438 u0437 u043c u0435 u043d u0435 u043d u0438 u00a0第二阶段的流量污泥值等于平均时间 u043f u0440 u0435 u0431 在研磨的第一阶段,u044b u0432 u0430 u043d u0438 u00a0 u0441 u044b u0440 u044c u00a0。 1升(l

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号