首页> 外国专利> METHOD FOR CONSTRUCTION OF EARTH DAM OF WATER-POWER PLANT AT ITS PUTTING INTO OPERATION BY STAGES

METHOD FOR CONSTRUCTION OF EARTH DAM OF WATER-POWER PLANT AT ITS PUTTING INTO OPERATION BY STAGES

机译:分阶段投入运行的水电厂土坝施工方法

摘要

the invention u043eu0442u043du043eu0441u0438u0442u0441u00a0 to u0433u0438u0434u0440u043eu0442u0435u0445u043du0438u0447u0435u0441u043au043eu043cu0443 construction. the purpose of u0438u0437u043eu0431u0440u0435u0442u0435u043du0438u00a0 - economic efficiency by u0441u043eu043au0440u0430u0449u0435u043du0438u00a0 of dam construction and u0443u0441u043au043eu0440u0435u043du0438u00a0 commissioning and its intermediate u0438u043bu0435u0439 that sustain their u043du0430u043fu043eu0440u043eu0432 hydroelectric plant.method u0437u0430u043au043bu044eu0447u0430u0435u0442u0441u00a0 in constructing intermediate profiles and markers for the intermediate pressure, and u0434u043eu0441u0442u0440u0430u0438u0432u0430u043du0438u0435u043c dam to project about u0444u0438u043bu00a0. in the implementation of the method u043fu0440u043eu0438u0437u0432u043eu0434u00a0u0442 u043eu0431u0436u0430u0442u0438u0435 grassroots repose each intermediate u043fu0440u043eu0444u0438u043bu00a0 by u0430u0440u043cu0438u0440u043eu0432u0430u043du0438u00a0 his metal or other fittings.the incremental input soil dam in operation of a hydraulic pressure u043fu043eu0437u0432u043eu043bu00a0u0435u0442 u0434u043bu00a0 electricity and other objectives are already in the process of construction as well. 2). with with
机译:本发明 u043e u0442 u043d u043e u0441 u0438 u0442 u0441 u00a0至 u0433 u0438 u0434 u0440 u043e u0442 u0435 u0445 u043d u043d u0438 u0447 u0435 u0441 u043a u043e u043c u0443的构建。 u0438 u0437 u043e u0431 u0440 u0435 u0442 u0435 u043d u0438 u00a0的目的-通过 u0441 u043e u043a u0440 u0430 u0449 u0435 u043d u0438 u00a0的经济效率大坝建设和 u0443 u0441 u043a u043e u0440 u0435 u043d u0438 u00a0调试及其中间 u0438 u043b u0435 u0439维持其 u043d u0430 u04330 u043f u043e u0440 u043e u0432方法 u0437 u0430 u043a u043b u044e u0447 u0430 u0435 u0442 u0441 u00a0用于构造中间压力的中间曲线和标记,以及 u0434 u043e u0441 u0441 u0442 u0440 u0430 u0438 u0432 u0430 u043d u0438 u0435 u043c坝投影到 u0444 u0438 u043b u00a0。在执行方法 u043f u0440 u043e u0438 u0437 u0432 u043e u0434 u00a0 u0442 u043e u0431 u0436 u0430 u0442 u0438 u0435基层分别放置每个中间 u043f u0440 u043e u0444 u0438 u043b u00a0由 u0430 u0440 u043c u0438 u0440 u043e u0432 u0430 u043d u0438 u00a0他的金属或其他配件。在液压作用下的增量输入土坝 u043f u043e u0437 u0432 u043e u043b u00a0 u0435 u0442 u0434 u043b u00a0电力和其他目标也已经在建设中。 2)。与

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号