首页> 外国专利> FOUNDATION CONSTRUCTION WORK FOR RECLAMATION SITE, BANKING SITE, AND THE LIKE

FOUNDATION CONSTRUCTION WORK FOR RECLAMATION SITE, BANKING SITE, AND THE LIKE

机译:填海工地,银行工地和类似建筑的基础施工工作

摘要

PURPOSE:To quickly construct a foundation at low cost by a method in which when reclamation work or banking work for the surrounding of caisson is ended, piles are driven through a caisson, base reinforcing bars are set in the caisson, and concrete is placed. CONSTITUTION:A caisson 1 is set at a given position before or during reclamation or banking work, and then reclamation or banking work is applied to the surrounding of the caisson 1. Piles 2 are penetrated through holes 12 and thin portions into the ground. Top end 21 projected in the caisson is chipped, reinforcing bar cage is set in the caisson 1, and concrete 4 is placed into the caisson and hardened. The period of the construction work can thus be shortened greatly, and a stable and strong foundation in which the piles and the caisson are integrated can be constructed.
机译:目的:通过一种方法来以低成本快速建造地基,该方法是在结束沉箱周围的填筑工作或堤岸工程时,通过沉箱打桩,在沉箱中放置基础钢筋,然后放置混凝土。构成:在填海或堤岸工程之前或之中,将沉箱1放置在给定位置,然后在沉箱1的周围进行填海或堤岸工作。桩2穿过孔12和较薄的部分穿入地面。突出在沉箱中的顶端21被切碎,在沉箱1中设置钢筋笼,并且将混凝土4放入沉箱中并硬化。因此,可以大大缩短工期,并且可以建造桩基和沉箱一体化的稳定而牢固的基础。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号