首页> 外国专利> Method of testing a production well and of perforating a new zone

Method of testing a production well and of perforating a new zone

机译:测试生产井并在新区域打孔的方法

摘要

A new sub-surface zone 406 of an existing production well (10) is perforated by shutting down production of the well through a production tubing bore (32) and running a coiled tubing test string (400) down into the production tubing string (26). The coiled tubing test string includes a perforating gun (402) and optionally a test packer (54). The gun (402) is fired adjacent the new zone (406) to make perforations (408) therein, and the coiled tubing string (400) is removed and production resumed.
机译:通过关闭通过生产油管孔(32)的井的生产并将连续油管测试管柱(400)向下插入生产油管柱(26),对现有生产井(10)的新地下区域406进行打孔。 )。连续油管测试管柱包括射孔枪(402)和可选的测试封隔器(54)。在新的区域(406)附近发射枪(402),以在其中形成孔眼(408),并且移开连续油管柱(400)并恢复生产。

著录项

  • 公开/公告号EP0586223A3

    专利类型

  • 公开/公告日1994-05-11

    原文格式PDF

  • 申请/专利权人 HALLIBURTON COMPANY;

    申请/专利号EP19930306863

  • 发明设计人 SCHULTZ ROGER L.;HARKINS GARY O.;

    申请日1993-08-31

  • 分类号E21B49/00;E21B43/11;

  • 国家 EP

  • 入库时间 2022-08-22 04:39:14

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号