PURPOSE: To obtain the most suitable monorail in compliance with the interval, etc., of a ceiling beam in a building structure by forming every one of a web and upper/lower tracks separately and combining them mutually, in a monorail in the title, having upper/lower rails respectively on the upper/lower ends of the web. ;CONSTITUTION: A monorail for a carrier travel guide suspended in a construction building is provided with an upper track 3 on whose upper surface 3A the front/rear travel drive wheel W of a carrier is rolled and on whose both right/left side surfaces 3B the upper lateral rolling prevention guide wheels W1 are rolled and a lower track 4 on whose both right/left side surfaces 4A the lower lateral rolling prevention guide wheels W2 are rolled. The upper/lower tracks 3, 4 are fixed to the upper/lower ends of a web 5 by engaging attachment owing to a tightening or calking process and the web 5 is tightened detachably to the flange Y1 of a hanger Y suspended on a ceiling beam. In this time, a pair of flanges 3C, 4B are projected on the lower surface of the upper rail 3 and the upper surface of the lower rail 4 respectively and three parts 3-5 are integrated together by the fitting and attachment of the recessed grooves formed between respective pair of flanges, around those flanges.;COPYRIGHT: (C)1995,JPO
展开▼