首页> 外国专利> Construction method null of reinforcement earth laid

Construction method null of reinforcement earth laid

机译:加筋土工法施工方法

摘要

PURPOSE:To simplify the operations by arranging supporting members between self-supporting form materials and drainage material side in which planar reinforcing materials are wrapped, removing the supporting members after construction of a banking body, and placing concrete between the form materials and the drainage materials. CONSTITUTION:A pit is excavated to install form materials 1 such as concrete panels, etc., into it, and then refilled to make the form materials self-supporting. Next the supporting members are arranged on the banking-body construction side of the form materials 1 through wedges, drainage materials 6 are wrapped up in the end parts of planar reinforcing materials 5, and banking materials 7 are laid over the other parts to construct a banking body. Further, each time one layer of the banking is constructed, the wedges and the supporting members are removed to be used for constructing the upper stages of the banking. After the removal of the supporting members, concrete is placed between the form materials 1 and the drainage materials 6 to construct a body concrete 8. Thus, the need for reaction force at the time of concrete placing can be eliminated to simplify the work.
机译:目的:为简化操作,在自支撑模板材料和排水材料侧面之间布置支撑构件,并包裹平面增强材料,在建造银行业主体后拆除支撑构件,并在模板材料和排水材料之间放置混凝土。组成:挖一个坑以将诸如混凝土板等的模板材料1装入其中,然后重新填充以使模板材料自支撑。接下来,将支撑构件通过楔形件布置在模板材料1的堤岸主体构造侧,将排水材料6包裹在平面增强材料5的端部中,并且将堤岸材料7覆盖在其他部分上,以构造壁板。银行机构。此外,每次构造堤岸的一层时,将楔形物和支撑构件去除以用于构造堤岸的上层。在除去支撑构件之后,将混凝土放置在模板材料1和排水材料6之间以构造主体混凝土8。因此,可以消除在放置混凝土时对反作用力的需求以简化工作。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号