摘要

PROBLEM TO BE SOLVED: To dispense with a relay pump at an intermediate part of a sludge pipe and ensure a working area behind a shield excavating area in a tunnel so as to be able to perform work such as the conveyance of shield segments, piping construction during shield excavation, or secondary lining during shield excavation even with a small tunnel diameter. ;SOLUTION: While feeding muddy water into a shield chamber 18 of a shield excavator 18 through a feed mud pipe 20, muddy water in the shield chamber 18 is discharged together with excavated sediment through a sludge pipe 22 to excavate a tunnel. In this case, a first sludge pump is disposed on the uppermost reaches of the sludge pipe 22, and a first pressure regulating tank and a large-displacement high-head pump 44 are placed on a rear truck, positioned on the lower reaches of the first sludge pump, so as to connect the sludge pipe 22. A second pressure regulating tank and a second sludge pump are installed at a shaft part of the sludge pipe 22 to transport sludge.;COPYRIGHT: (C)1997,JPO
机译:解决的问题:在污泥管的中间部分省去中继泵,并确保在隧道中的盾构挖掘区后面有一个工作区,以便能够进行诸如盾构段的输送,管道施工等工作。在盾构开挖过程中,或在盾构开挖过程中使用二次衬砌,即使隧道直径较小。 ;解决方案:当通过进料泥浆管20将浑浊的水送入屏蔽挖掘机18的屏蔽室18时,屏蔽室18中的浑浊的水与挖出的沉淀物一起通过污泥管22排出以开挖隧道。在这种情况下,将第一污泥泵设置在污泥管22的最上游,将第一压力调节箱和大排量高扬程泵44放置在后卡车上,该后卡车位于垃圾箱22的下游。第一污泥泵,以连接污泥管22。在污泥管22的轴部安装第二调压箱和第二污泥泵以运输污泥。版权所有:(C)1997,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号