首页> 外国专利> CAST BLOCK FOR CONSTRUCTION WORK AND IRON TOWER TEMPORARILY SETTING METHOD USING IT

CAST BLOCK FOR CONSTRUCTION WORK AND IRON TOWER TEMPORARILY SETTING METHOD USING IT

机译:建筑工程用铸块和铁塔的临时设定方法

摘要

PROBLEM TO BE SOLVED: To simply obtain a sufficiently safe method without disposing of and processing waste. SOLUTION: Cast blocks for construction work consists of cubic cast, the fitting recess parts 18 and the fitting projection parts 19 of adjacent blocks 8 are fitted to each other, they are arranged and can be overlapped. Iron tower temporary setting comprises a first process for excavating and leveling the ground, a second process for attaching floor plate material 38 on soil leveling the ground so that the upper face thereof may be wholly horizontal, a third process for attaching a leg attaching beam 39 having leg attaching material 40 onto the floor plate material 38, a fourth process for successively fitting and arranging cast blocks 8 for construction work on the floor plate material 38 and overlapping a plurality of the blocks 8 at necessary parts, and a fifth process for attaching a temporary iron tower to the leg attaching material 40. In the case where a temporary iron tower is removed, noise and waste disposal of industrial products are not produced because the blocks 8, flat plates 37, the floor plate material 38 and the leg attaching beams 39 can be used again.
机译:要解决的问题:简单地获得一种足够安全的方法,而不处理和处理废物。解决方案:用于建筑工程的铸块由立方铸件组成,相邻块8的装配凹槽部分18和装配突起部分19相互装配,它们可以排列并且可以重叠。铁塔临时设置包括用于挖掘和平整地面的第一过程,用于将地板材料38附着在平整地面以使其上表面可以完全水平的第二过程,用于附着腿部附着梁39的第三过程。具有将腿部附接材料40接合到地板材料38上的第四过程,用于将用于建筑工作的铸块8相继地装配和布置在地板材料38上并且在必要的部分处重叠多个块8的第四过程,以及用于附接的第五过程临时铁塔固定在腿连接材料40上。在除去临时铁塔的情况下,由于块体8,平板37,地板材料38和腿固定,因此不会产生工业产品的噪音和废物处理。梁39可以再次使用。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号