首页>
外国专利>
Controlled blasting construction method null of base rock
Controlled blasting construction method null of base rock
展开▼
机译:基岩控制爆破施工方法无效
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE:To carry out a controlled blasting efficiently without reducing the excavation speed by crushing and drilling the center of the facing of a tunnel by a static crushing means, and after that, crushing around the above crushed and drilled part by a normal blasting method. CONSTITUTION:At the center of the facing 1 of a tunnel, a crushed and drilled part 5 is formed by a static crushing means using no blasting, by using a rubber tube type rock crusher using a pressure liquid, for example. Then, bore holes 6 are engraved around the crushed and drilled part 5, an explosive is loaded, and the tunnel facing 1 is crushed in a normal blasting method. And the whole surface of the facing is not crushed and drilled, but only the center of the facing is crushed and drilled by a static crushing means, so as to reduce the rigidity around the facing, and the area around the facing can be crushed easily. Consequently, a noise and a vibration can be reduced, and the reduction of excavation speed can be prevented.
展开▼