Rapid Construction Techniques of Deep Underground Large-Section Rock Drifts by Drilling and Blasting Method

机译:深层地下大岩石漂移的快速施工技术通过钻孔和爆破方法

获取原文

摘要

To increase the construction speed of deep underground large-section rock drifts, this paperanalysed the main factors influencing the construction speed based on the essential processes of drift driving.For the construction method by drilling and blasting, it not only discussed systematically the effects of such factors to the construction speed as blasting and supporting parameters, equipment matching,construction crew,organization and management,but also proposed the countermeasures of expediting construction speed.Subsequently, a rapid construction scheme was worked out and applied in the construction of a deep underground large-section rock drift at Wanglou colliery in Shandong province.The field test results showed that the average monthly advance was up to 108.8m,which increased the construction speed by 117.6% compared with the average monthly advance of 50 m in other similar drifts.It suggests from this paper that to speed up the construction of deep underground large-section rock drifts, we should comprehensively analyze the factors of influencing construction speed by taking the drift driving as a systematic engineering and emphatically grasp the key issues to make the reasonable construction plan for each specific project.
机译:为了提高深层地下岩石漂移的施工速度,这是根据漂移驾驶的基本过程影响施工速度的主要因素。通过钻井和爆破,对于施工方法,它不仅系统地讨论了这些方法施工速度为爆破和配套参数,设备匹配,建筑机组,组织和管理的因素,还提出了加快施工速度的对策。随着速度,施工快速施工方案,应用于深层地下施工山东省王某煤矿的岩石漂移。现场测试结果表明,平均每月推进高达108.8米,施工速度增加117.6%,与其他类似漂移50米的平均每月前进。它从本文提出,加快建设深层底部r ock漂移,我们应该通过将漂移驱动作为系统工程,全面分析影响施工速度的因素,并强调掌握关键问题,为每个特定项目做出合理的施工计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号