首页> 外国专利> HEAD WORKS OF HYDROELECTRIC POWER PLANT

HEAD WORKS OF HYDROELECTRIC POWER PLANT

机译:水电站总厂

摘要

FIELD: hydroelectric power engineering; construction of head works in case of lack of space on rivers carrying heavy debris. SUBSTANCE: head works has spillway dam with surface water outlet 2, with sludge bowl 3 having chambers 4 arranged along it on upstream side. Top wall 5 of dam 1 functions as one of walls of sludge bowl 3, and foundation plate of dam 1 is used as sludge bowl bottom; sludge bowl 3 has water blow outlet 7 with main and duplicate gates 9 and 10, respectively. As water enters sludge bowl 3, its flow speed reduces and sludge settles down on bottom of chambers 4. Upon accumulation of sludge, gate 9 opens in water blow outlet 7, and sludge flows downstream. EFFECT: improved design. 2 dwg
机译:领域:水力发电工程;在运送重物的河流空间不足的情况下,建造头部工程。实质:渠首工程的溢洪坝带有地表水出口2,污泥池3的上游侧设有沿其布置的腔室4。大坝1的顶壁5用作污泥池3的壁之一,大坝1的基础板用作污泥池的底部。污泥池3具有吹水出口7,其分别具有主闸门和复式闸门9和10。当水进入污泥池3时,其流速降低,污泥沉降在腔室4的底部。污泥积聚后,闸门9在吹水出口7中打开,污泥向下游流动。效果:改进的设计。 2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号