首页> 外国专利> HEAD WORKS OF HYDROELECTRIC POWER PLANT

HEAD WORKS OF HYDROELECTRIC POWER PLANT

机译:水电站总厂

摘要

FIELD: hydraulic engineering. SUBSTANCE: head works is built in narrow site and has spillway dam 1 with surface water outlet 2, water intake, clarifier with sludge chambers 4, sluice chamber 7, gates 9 and 10. Novelty is that clarifier is combined with spillway dam and placed along dam on upstream side; used as clarifier bottom is foundation slab of dam and one of its walls is upstream wall 5 of dam. EFFECT: reduced space requirement, scope of work and construction time for head works of hydroelectric power plants. 1 cl, 2 dwg
机译:领域:水利工程。实质:水头工程建在狭窄的地点,并具有溢洪坝1和地表水出口2,进水口,带有污泥室4的澄清池,水闸室7,闸门9和10。新颖之处在于,澄清池与溢洪坝结合在一起并沿其放置大坝上游用作澄清池的底部是大坝的基础板,其一壁是大坝的上游壁5。效果:减少了水力发电厂总工程的空间要求,工作范围和施工时间。 1厘升,2载重吨

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号