首页> 外文期刊>哈尔滨工业大学学报(英文版) >Optimal operation of cascaded hydroelectric power plants in the power market
【24h】

Optimal operation of cascaded hydroelectric power plants in the power market

机译:电力市场中梯级水力发电厂的优化运行

获取原文
获取原文并翻译 | 示例
       

摘要

An improved network flow algorithm, which includes the minimum cost network flow and the same period network flow, is proposed to solve the optimization of cascaded hydroelectric power plants in a competitive electricity market. The typical network flow is used to find the feasible flow and add the discharge water to different cascaded hydroelectric power plants at the same step. The same period network flow is used to find the optimal flow and add the power output at a different step. This new algorithm retains the advantages of the typical network flow, such as simplicity and ease of realization. The result of the case analysis indicates that the new algorithm can achieve high calculation precision and can be used to calculate the optimal operation of cascaded hydroelectric power plants.
机译:提出了一种改进的网络流量算法,该算法包括成本最小的网络流量和同期的网络流量,以解决竞争激烈的电力市场中梯级水力发电厂的优化问题。典型的网络流量用于查找可行流量,并在同一步骤将排放水添加到不同的梯级水力发电厂。相同周期的网络流量用于找到最佳流量,并在不同的步骤增加功率输出。这种新算法保留了典型网络流的优点,例如简单易实现。实例分析结果表明,该算法具有较高的计算精度,可用于梯级水电站的最优运行计算。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号