首页>
外国专利>
EXECUTION METHOD OF TUNNEL INVERT AND PRECAST PLATE FOR TUNNEL INVERT
EXECUTION METHOD OF TUNNEL INVERT AND PRECAST PLATE FOR TUNNEL INVERT
展开▼
机译:隧道反演及隧道反演的预制板执行方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To shorten the term of works, and to ensure one-side traffic. ;SOLUTION: A plurality of precast plates 6, 6 having a shape that the precast plates are divided into two in the cross direction of a tunnel are formed to the invert 5. A plurality of the precast plates 6 are installed on one side in the cross direction of the tunnel, and a plurality of the precast plates 6 are mounted on the other side in the cross direction of the tunnel. Since a plurality of the precast plates 6 are set up on one side of the cross direction of the tunnel while ensuring traffic on the other side, traffic can be secured even during the period of the execution of works. Since the invert 5 using the precast plates 6 is executed, operating efficiency can be improved while the invert 5 having stable quality can be formed.;COPYRIGHT: (C)1998,JPO
展开▼