首页> 外国专利> EXECUTION METHOD OF TUNNEL INVERT AND PRECAST PLATE FOR TUNNEL INVERT

EXECUTION METHOD OF TUNNEL INVERT AND PRECAST PLATE FOR TUNNEL INVERT

机译:隧道反演及隧道反演的预制板执行方法

摘要

PROBLEM TO BE SOLVED: To shorten the term of works, and to ensure one-side traffic. ;SOLUTION: A plurality of precast plates 6, 6 having a shape that the precast plates are divided into two in the cross direction of a tunnel are formed to the invert 5. A plurality of the precast plates 6 are installed on one side in the cross direction of the tunnel, and a plurality of the precast plates 6 are mounted on the other side in the cross direction of the tunnel. Since a plurality of the precast plates 6 are set up on one side of the cross direction of the tunnel while ensuring traffic on the other side, traffic can be secured even during the period of the execution of works. Since the invert 5 using the precast plates 6 is executed, operating efficiency can be improved while the invert 5 having stable quality can be formed.;COPYRIGHT: (C)1998,JPO
机译:要解决的问题:缩短工期,并确保单方流量。 ;解决方案:将多个预制板6、6形成为在隧道的横向上将预制板分成两部分的形状,该多个预制板6、6形成在倒置部5上。多个预制板6安装在该预制板的一侧。在该隧道的横向方向上,多个预制板6安装在该隧道的横向方向的另一侧。由于在隧道横向的一侧设置多个预制板6,同时确保另一侧的通行,因此即使在工程执行期间也可以确保通行。由于使用预制板6执行逆变器5,因此可以提高操作效率,同时可以形成质量稳定的逆变器5 。;版权所有:(C)1998,日本特许厅

著录项

  • 公开/公告号JPH10220186A

    专利类型

  • 公开/公告日1998-08-18

    原文格式PDF

  • 申请/专利权人 NIPPON SAMIKON KK;

    申请/专利号JP19970019440

  • 发明设计人 SHICHIKU TSUNEHIRO;MATSUBA YOSHIHARU;

    申请日1997-01-31

  • 分类号E21D11/04;E21D9/00;

  • 国家 JP

  • 入库时间 2022-08-22 03:07:18

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号