首页> 外国专利> TUNNEL EXCAVATION AND LINING EQUIPMENT AND ITS EXCAVATION AND LINING METHOD

TUNNEL EXCAVATION AND LINING EQUIPMENT AND ITS EXCAVATION AND LINING METHOD

机译:隧道开挖衬砌设备及其开挖和衬砌方法

摘要

PROBLEM TO BE SOLVED: To enable a quick primary lining without replacing excavators and earth carrying machines by downsizing a form by division into an upper portion and a lower portion, and making them travel on two rails installed on a ceiling separately. ;SOLUTION: An upper form 1 is comprised of multiple partial forms 1a, 1b, 1c that can be spread and fixed, and folded. The partial forms 1a and 1b are connected to each other with a hinge locking device 2 so that they may be spread and folded. In the partial form 1a, a strut pipe 5 is lifted and lowered with right and left chain blocks. Two rails 9, 9 are suspended from the ceiling slidably, and a travel frame and a two-point horizontal electric chain block 36 are installed independently so that they can travel on the rails 9. A lifting frame 12 is fixed to the travel frame, and lifted with a form lift. By traveling the form on the ceiling rails 9 excavation of a space in the center and the next work can be done and then quick execution of the excavation and lining of a large cross section is also made possible.;COPYRIGHT: (C)1998,JPO
机译:要解决的问题:通过分割成上部和下部的尺寸缩小,并使它们在分别安装在天花板上的两个导轨上移动,从而在不更换挖掘机和土方机械的情况下实现快速的衬砌。 ;解决方案:鞋帮模板1由多个可扩展,固定和折叠的局部模板1a,1b,1c组成。分模1a和1b通过铰链锁定装置2彼此连接,从而可以展开和折叠。在局部形式1a中,支杆管5通过左右链节被提升和降低。两个轨道9、9可滑动地悬挂在天花板上,并且独立地安装有行进框架和两点水平电链块36,以便它们可以在行进轨道9上行进。升降框架12固定在行进框架上,然后用举升机抬起通过在天花板导轨9上移动模板,可以在中心开挖一个空间,然后进行下一个工作,然后还可以快速执行大截面的开挖和衬砌。版权所有:(C)1998,日本特许厅

著录项

  • 公开/公告号JPH10292793A

    专利类型

  • 公开/公告日1998-11-04

    原文格式PDF

  • 申请/专利权人 KONOIKE CONSTR LTD;

    申请/专利号JP19970103377

  • 发明设计人 HERIDA MASAMI;SAITO KENJI;KAWAZOE SUMIO;

    申请日1997-04-21

  • 分类号E21D11/10;

  • 国家 JP

  • 入库时间 2022-08-22 03:06:20

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号