首页> 外国专利> CONSTRUCTION METHOD OF BRIDGE UTILIZING STRETCHED CABLE

CONSTRUCTION METHOD OF BRIDGE UTILIZING STRETCHED CABLE

机译:桥架拉索的施工方法

摘要

PROBLEM TO BE SOLVED: To provide a construction method of a bridge wherein a road for construction is not needed for transporting materials and mechanical equipment up to an intermediate pier, cost and construction period can be reduced, the design cross area force of a girder member during bridge construction is not made greater than that after bridge completion, and earthquake resistance of the bridge during construction can be improved. ;SOLUTION: The construction method of a bridge is composed of a process for stretching a cable 13 between abutments 11b, a process for fixing the cable 13 on piers 15a, 15b previously vertically provided between the abutments, and a process for successively transporting a plurality of precast members 20 as the cable 13 is made a track and continuously providing them between the abutment and the pier and between the piers. A member formed to previously precast a web member vertically provided from a lower floor board and an upper floor board as the precast member 20 may be employed, and after the precast member is continuously provided between the abutment and the pier, a process forming the upper floor board may be included on the web member.;COPYRIGHT: (C)1998,JPO
机译:要解决的问题:提供一种桥梁的施工方法,其中不需要用于将材料和机械设备运输到中间墩的施工道路,可以减少成本和施工时间,梁构件的设计横截面力不使桥梁施工时的强度大于桥梁竣工后的强度,可以提高桥梁的施工时的抗震性。 ;解决方案:桥梁的建造方法包括以下步骤:在支座11b之间拉伸电缆13;将电缆13固定在先前在支座之间垂直设置的墩15a,15b上的过程;以及依次运输多个支座的过程。当预制构件20被制成轨道13时,该预制构件20的一部分被连续地设置并且在基台和桥墩之间以及桥墩之间连续提供它们。可以采用形成为预先预制从下地板和上地板垂直设置的腹板构件的构件作为预制构件20,并且在将预制构件连续设置在桥台和墩之间之后,形成鞋帮的过程。地板可能包含在网络成员中。;版权所有:(C)1998,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号